Challenge

  • The client contacted Sparrows to mobilise personnel to undertake troubleshooting on a faulty fire pump hydraulic system (pressure fluctuations reported)
  • A hydraulic supervisor and hydraulic technician were mobilised at short notice to undertake troubleshooting and the hydraulic pump-assembly was identified as the root cause
  • The decision was taken to remove the hydraulic pump-assembly and return to our specialist hydraulic pump and motor refurbishment workshop for strip down and inspection
  • The hydraulic pump-assembly consisted of an A4VSO500+A4VSO355+A4FO125 (22 series). On strip down and inspection, the internals of the pumps were showing signs of break-up / damage. During the fault-finding trip, the last oil analysis lab report found the system to be contaminated (ISO 4406:1999 22/19/13) / operating outwith the required cleanliness level of the system (ISO 4406: 16/12).

Solution

  • The option to refurbish the existing hydraulic pump-assembly and supply of new were both investigated. The supply of a new hydraulic pump-assembly was chosen, as this offered the benefit of removing the obsolete units and the shortest lead time
  • The new hydraulic pump-assembly was supplied pre-set for application. An Engineering Management of Change (EMOC) was undertaken to compare the existing vs new hydraulic pump-assembly. As part of the EMOC process, a difference in the overall length of the A4VSO355 was discovered which changed the position of the outlet and inlet ports on the A4FO125 pump
  • The existing pipe spool, installed between the outlet of the A4FO125 pump and manifold assembly on the outlet of the A4VSO500 pump, was too long / unable to fit
  • The pipe spool and manifold were returned from site to allow the pipe spool to be modified to suit the new hydraulic pump-assembly. The modified pipe spool was cut back, re-welded, Magnetic Particle Inspection (MPI) completed (pre-pressure test), pressure tested, MPI completed (post-pressure test), chemically cleaned / pickled and flushed
  • Prior to delivery, the manifold and modified pipe spool were installed on the new hydraulic pump assembly to ensure they fit correctly
  • Sparrows re-mobilised a hydraulic supervisor and hydraulic technician to undertake the flushing, hydraulic pump-assembly and commissioning during a planned shutdown. The scope included:
    • Flushing of all hydraulic system pipework / tubing and heat exchanger (note: the hydraulic system pipework 114.3mm OD and 90mm OD were flushed in-situ) to ISO 4406:1999 17/15/12 or better
    • Drain and clean hydraulic tank internals
    • Installation of the new hydraulic pump-assembly
    • Replacement of hydraulic hoses installed within the hydraulic tank and reinstatement of manifold and pipework
    • Reinstall hydraulic pump-assembly coupling half to pump shaft / engine (note: this required the coupling half to be heated to +80 to 100OC and press fit onto the pump shaft, as per the coupling OEM instructions)
    • Refill hydraulic tank with new pre-flushed (to ISO 4406:1999 17/15/12 or better) hydraulic oil
    • Commissioning and testing
  • The scope was successfully completed and the fire pump system returned to service within the timescale of the shutdown, avoiding any delays to startup operations
  • A full close-out / certification package for the scope was provided to the client.

Summary

Integrated solutions

  • Equipment upgrade
  • Fault finding and repair

Capabilities / services

  • Fluid power / hydraulics

Equipment sale and rental

  • Hydraulic rental equipment.

Download case study

Hydraulic pump-assembly replacement for fire pump system

Download pdf options:
More Offshore Energy Case Studies

This site uses cookies. They let you easily navigate your way around the site and allow us to improve its performance. By continuing to browse the site you are agreeing to our use of cookies. Learn more about how we use cookies.